Dialogue: d93-19.2 Number of utterances files: 58 Length of dialogue: 161.404193 Estimated number of turns: 53 utt1 : s: hello can I help you utt2 : u: okay um our task is to get uh the maximum number of oranges to Bath by seven a.m. and it's midnight so we have seven hours utt3 : + um let's see + utt4 : s: + okay maximum amount + of oranges utt5 : u: um well we have if we take let's see h- how long would it take to get to take engine well let's see engine number two with two boxcars utt6 : s: mm-hm utt7 : u: um utt8 : and and ca- you you can start two engines at the same time utt9 : s: yep utt10 : u: okay if we start um engine one uh to uh start it on its way to Dansville utt11 : s: mm-hm utt12 : u: um and start engine number two um with two boxcars from Elmira utt13 : s: okay utt14 : u: okay and take well take engine number two utt15 : s: + mm-hm + utt16 : u: + um + with two boxcars to Corning utt17 : s: mm-hm utt18 : u: and pick up uh and pick up your oranges utt19 : s: mm-hm utt20 : u: and then um go uh see um then I guess we'd have to take that to Bath utt21 : s: right utt22 : u: um w- and then at the same time though have engine number one um picking up boxcars the three boxcars in Dansville utt23 : s: right utt24 : u: and uh and then uh taking those boxcars to Corning utt25 : s: okay utt26 : u: um so h- how mu- well let's see how much time would it take for the I guess the longer trip would be from Avon to Corning right utt27 : s: to a- yes that's right that'll take four + hours + utt28 : u: + f- four + hours utt29 : s: right utt30 : u: and the loading takes an hour each for each boxcar + or + utt31 : s: + no you + can load all the boxca(rs)- or you can load a set of boxcars in an hour utt32 : u: okay so that will be what five hours i- when by the time we get done loading in + Corning + utt33 : s: + y- yeah + right + o- of engine + one + right + utt34 : u: + okay + utt35 : + right + um hm utt36 : I guess we're not gonna be able to make it back in time utt37 : s: + for another + load utt38 : u: + if we did + utt39 : well I mean we'd have to get them we'd have to get oh t- how long does it take to get from Corning to Bath two + hours + utt40 : s: + two + hours + yeah + utt41 : u: + oh + so that would be perfect if we do it that w(ay)- if we uh utt42 : s: with engine one utt43 : u: with engine one utt44 : s: right utt45 : u: so that's the maximum we can get with engine one utt46 : s: right utt47 : u: see engine two takes how long two hours to get from Elmira to Corning utt48 : s: that's right one hour to load utt49 : u: one h- that's three and then then there'd be + uh + utt50 : s: + another two + hours utt51 : u: f- okay so as that would be the maximum too wouldn't it utt52 : s: + yeah that's right + utt53 : u: + cause cause + we can't get back to Corning to load the other two that are at + Bath + utt54 : s: + that's + right that's right utt55 : u: so the maximum number is five then right utt56 : s: yep utt57 : u: okay utt58 : s: okay